Skip to content

// Anna University, Chennai / 2023

Anna University — Power System Operation and Control (EE8702), April/May 2023

Power System Operation and Control · EE8702 · R2017 · B.E. Electrical and Electronics Engineering · Semester 7

Files open in a new tab. Use your browser's download or save option to keep a copy.

Work through the questions

16 questions

No verified answers are available for this paper.

  1. Question 1

    Part ADescriptive2 marks

    Power System Operation and Control

    Define load curves and give the types.

    No verified answer or solution is available for this question.

  2. Question 2

    Part ADescriptive2 marks

    Power System Operation and Control

    Write the necessary conditions for two synchronous generators sharing the load in parallel operation.

    No verified answer or solution is available for this question.

  3. Question 3

    Part ADescriptive2 marks

    Power System Operation and Control

    Give the advantages of the AVR loop over ALFC.

    No verified answer or solution is available for this question.

  4. Question 4

    Part ADescriptive2 marks

    Power System Operation and Control

    Draw the block diagram representation of two area systems.

    No verified answer or solution is available for this question.

  5. Question 5

    Part ADescriptive2 marks

    Power System Operation and Control

    List the sources of reactive power and its controlling methods.

    No verified answer or solution is available for this question.

  6. Question 6

    Part ADescriptive2 marks

    Power System Operation and Control

    When is feedback stability compensation used?

    No verified answer or solution is available for this question.

  7. Question 7

    Part ADescriptive2 marks

    Power System Operation and Control

    Differentiate the economic load dispatch and optimal power flow.

    No verified answer or solution is available for this question.

  8. Question 8

    Part ADescriptive2 marks

    Power System Operation and Control

    What are the objectives of hydrothermal scheduling?

    No verified answer or solution is available for this question.

  9. Question 9

    Part ADescriptive2 marks

    Power System Operation and Control

    Give the functions of the control center.

    No verified answer or solution is available for this question.

  10. Question 10

    Part ADescriptive2 marks

    Power System Operation and Control

    What is weighted least square estimation?

    No verified answer or solution is available for this question.

  11. Question 11

    Part BDescriptive13 marks

    Power System Operation and Control

    (a) Explain the necessity of voltage and frequency regulation in the power system. (OR) (b) What are the components of the speed governor system of an alternator? Derive mathematical model of the speed governor system with aid of a block diagram.

    No verified answer or solution is available for this question.

  12. Question 12

    Part BDescriptive13 marks

    Power System Operation and Control

    (a) Draw the transfer function block diagram for a single area system provided with static analysis of an uncontrolled case and controlled case. (OR) (b) Explain with a neat block diagram the integration of economic dispatch with toad frequency control.

    No verified answer or solution is available for this question.

  13. Question 13

    Part BDescriptive13 marks

    Power System Operation and Control

    (a) (i) Demonstrate in brief the brushless excitation system. (7) (ii) Point out the relations between voltage, power, and reactive power at a node for applications in power system control. (6) (OR) (b) Explain the operation of TCR and TSC with necessary V-I characteristics.

    No verified answer or solution is available for this question.

  14. Question 14

    Part BDescriptive13 marks

    Power System Operation and Control

    (a) What is meant by unit commitment? and briefly explain the constraints on unit commitment. (OR) (b) Consider two units of a plant that have fuel costs of F1 = 0.2 P1^2 + 40 P1 + 120 Rs./h F2 = 0.25 P2^2 + 30 P2 + 150 Rs./h (i) Determine the economic operating schedule and the corresponding cost of generation for the demand of 180 MW. (7) (ii) If the load is equally shared by both units, determine the savings obtained loading the units optimally. (6)

    No verified answer or solution is available for this question.

  15. Question 15

    Part BDescriptive13 marks

    Power System Operation and Control

    (a) Briefly discuss the energy control centers and their functions. (OR) (b) Describe the various functions of SCADA in the control of power systems.

    No verified answer or solution is available for this question.

  16. Question 16

    Part CDescriptive15 marks

    Power System Operation and Control

    (a) A 132 kV line is fed through an 11/132 kV transformer from a constant 11 kV supply. At the load end of the line, the voltage is reduced by another transformer of a nominal ratio: 132/11kV. The total impedance of the line and transformers at 132kV is (25+j66)V. Both transformers are equipped with tap-changing facilities which are arranged so that the product of the two off-nominal settings is unity. If the load on the system is 100 MW at 0.9 p.f. lagging. Calculate the settings of the tap-changers required to maintain the voltage of the load bus bar at 11 kV Use a base of 100 MVA. (OR) (b) Analyze the economic dispatch of thermal units considering with and without transmission losses.

    No verified answer or solution is available for this question.

Keep preparing

Revisit another year or explore a different paper in the library.

More from this exam