// Anna University, Chennai / 2025
Anna University — Power System Operation and Control (EE3602), April/May 2025
Power System Operation and Control · EE3602 · R2021 · B.E. Electrical and Electronics Engineering · Semester 6
Files open in a new tab. Use your browser's download or save option to keep a copy.
Work through the questions
16 questions
No verified answers are available for this paper.
Power System Operation and Control
The values of demand factor and load factor are always less than 1. Why?
No verified answer or solution is available for this question.
Power System Operation and Control
What happens to power grid frequency, if the load on the generator increases?
No verified answer or solution is available for this question.
Power System Operation and Control
State the necessary conditions to be satisfied for operating alternators in parallel?
No verified answer or solution is available for this question.
Power System Operation and Control
What do you mean load frequency control in a two-area power system to maintain constant frequency in an inter-connected power system?
No verified answer or solution is available for this question.
Power System Operation and Control
State how a synchronous machine can be configured as a synchronous condenser.
No verified answer or solution is available for this question.
Power System Operation and Control
List some of the voltage control techniques that maintains voltage stability in power system networks.
No verified answer or solution is available for this question.
Power System Operation and Control
List the equality and inequality constraints considered in the economic dispatch problem.
No verified answer or solution is available for this question.
Power System Operation and Control
Differentiate between unit commitment and Economic load dispatch.
No verified answer or solution is available for this question.
Power System Operation and Control
State how Phasor measurement units are utilized for Wide Area Monitoring System
No verified answer or solution is available for this question.
Power System Operation and Control
Mention the significance of Energy Control Centers.
No verified answer or solution is available for this question.
Power System Operation and Control
(a) A power station has to meet the following demand: Group A : 200 kW between 8 A.M. and 6 P.M. Group B : 100 kW between 6 A.M. and 10 A.M. Group C : 50 kW between 6 A.M. and 10 A.M. Group D : 100 kW between 10 A.M. and 6 P.M. and then 6 P.M. and 6 A.M. (i) Diversity factor (4) (ii) Units generated per day (4) (iii) Load factor (5) (OR) (b) Explain the need for voltage and frequency regulation in power system.
No verified answer or solution is available for this question.
Power System Operation and Control
(a) Draw the transfer function model diagram of uncontrolled two area load frequency control system and describe the salient features under static condition. (OR) (b) Enumerate the need for speed governing mechanism and explain how load sharing can be accomplished between two alternators running in parallel using governor speed - droop characteristics.
No verified answer or solution is available for this question.
Power System Operation and Control
(a) With neat schematics explain in detail the different types of FACTS controllers. Also discuss the significance of reactive power management. (OR) (b) What is a STATCOM? Discuss its construction and working. Compare between STATCOM and SVC in the following (i) V-I characteristics (6) (ii) Voltage compensation and stability (7)
No verified answer or solution is available for this question.
Power System Operation and Control
(a) With a neat flowchart, explain how unit commitment problem can be solved using priority list method. Also discuss its merits and demerits. (OR) (b) The cost characteristic of two units in a plant are: C1 = 0.4 P1^2 + 160 P1 + K1 Rs./h C2 = 0.45 P2^2 + 120 P2 + K2 Rs./h Where P1 and P2 are power output in MW. Find the optimum load allocation between the two units, when the total load is 162.5 MW.
No verified answer or solution is available for this question.
Power System Operation and Control
(a) What is a SCADA system and what role does it plays in an electrical power system. With a neat block diagram, explain the various the hardware components involved and the functional aspects of SCADA system (OR) (b) Utilizing the state transition diagram, explain the various states of the power system network and its associated control actions.
No verified answer or solution is available for this question.
Power System Operation and Control
(a) Two 50 Hz generators of rating 100 MW and 300 MW are operating in parallel. Each of them has a speed regulation of 5%. They supply a total load of 320 MW. Assume that the speed changers are set to give rated frequency at 100% rated output power. Determine the output power of each generator and the operating frequency. (OR) (b) (i) Draw the block diagram of AVR. Explain the significance of stability compensation in AVR loop? (7) (ii) In AVR, high open loop gain is needed for better static accuracy; but this causes undesirable dynamic response, possibly instability. Justify the statement. (8)
No verified answer or solution is available for this question.